Hi, The 'Reason' field for a pending job has changed from 'Priority' to 'BadConstraints'. This seems to be because the status of one of the nodes in the node list reported by 'scontrol show job' has changed to 'draining'. The job itself just specifies the number of tasks required, not specific nodes.
Shouldn't the scheduler just be able to replace the draining node with another node in the projected node list? This is happening with version 15.08.8. Cheers, Loris -- Dr. Loris Bennett (Mr.) ZEDAT, Freie Universität Berlin Email [email protected]
