-----Original Message-----
From: "Michael Mee"

What a day ....  Drew and I arrived in Gulfport MS at 8am - without our 
luggage. It joined us later in the day (minus a gel cell battery that 
TSA apparently needed).

After a few wrong turns (you don't really appreciate hwy signs until 
they're missing), we ended up at the EOC (Emergency Operation Center) 
which is at the Bay St Louis airtpot out of town.

Driving around was weird. Things looked pretty normal, except that every 
now and again there would be a house in some strange place, or a car 
upside down. The large roadside advertising signs were shredded or 
knocked over entirely.

Lots of traffic. An amazing amount. A maintain that the most dangerous 
part of being here is driving. Lights aren't working (no power), large 
vehicles on the road, lots of vehicles off the road. Police and other 
emergency vehicles zooming around.

The EOC is crowded. There's "International AID" (? I think), who the 
county called in to manage donations - including a huge pile of clothes 
that will get baled and sent to Africa, a pile of tents donated by China 
(but most have the wrong poles). The military have an awesome presence 
here. Hot water shower truck. Laundry truck (drop off, pick up 24 hrs 
later), mess tent. They provide a great service. Lots of fire crews from 
around the country (they search house wreckage for missing people).

On the computer side, Drew and I were set to work building PCs to go 
into shelters. However, the main push has been to get voip phones into 
shelters. Driving around you can see why. Alongside the road are large 
phone cabinets with no doors - and no panels inside. The wind and water 
ripped off the doors and then took out all the wiring. There is sporadic 
cell phone service (lots of busy signals), but almost no wired services.

The big push here has been to bring in a DS3 (45MBit) feed from 
Gulfport. They're trying to do thiw with a two hop link (via a 
electricity comms tower) using Trango 45Mbit 5.8GHz gear. After a side 
job of reconfiging a Linksys WRT54g to be a bridge to use to link two 
medical tents in a large parking area), I went out to the bottom of the 
2nd tower and spent an hour installing POEs and zip tying everything so 
it would be reliable. The water tower is ringed with 900MHz radios with 
60 degree sectors. These will be used to supply shelters with bandwidth 
for voice and internet.

Which was the next lesson. It is HOT out here. You drink water 
constantly, sweat drips off you. I was inside a tin shed with my head in 
an equipment box. Phew.

In the evening after dinner (steak!) Drew and I went back to add some 
patch cables to finish off the config.

To finish off, we installed a bridge into one of the aid groups here at 
EOC - wow, they were so happy to be able to read their email. And then 
another person in the group got some fire fighters online - another very 
happy group. Its hard to underestimate how much internet dialtone has 
become part of doing a modern job.

cheers, michael


_______________________________________________
SoCalFreeNet.org General Discussion List
To unsubscribe, please visit: 
http://socalfreenet.org/mailman/listinfo/discuss_socalfreenet.org




Reply via email to