2011/5/24, Ole Troan <[email protected]>:
>
> I would suggest incorporating the motivational parts of this document into
> stateless-4v6-motivation

If we are supposed to converge these two drafts, the below is my
proposal to reorganize the draft

1. Introduction

2. Operational Motivations Analysis

2.1 Improving Network Efficiency
Note: This section states the benefits for off-loading traffic
processing,  e.g. reduction of logging information, efficient
transmission of data packages, etc..

2.1.1 NAT Logging Consideration
2.1.2 Avoiding Centralized Traffic Bottleneck
2.1.3 Optimizing Encap/Decap and Translation
2.1.4 xxxxx

2.2 Simplifying Network Maintenance

Note: This section states the consideration for reducing subsequent
efforts of network maintenance.

2.2.1 High Availability(HA) Consideration
2.2.2 Relief Qualification Procedures
2.2.3 xxxxx

2.3 Decreasing Transition costs
Note: This section makes costs comparison analysis.
2.3.1 Transition Costs Consideration

2.4 Facilitating Service Evolution
Note: This section states the cooperation between stateless 4via6 and
service provisioning, e.g. the subsection "Implicit Host
Identification" and "No Organizational Impact" in
draft-operators-softwire-stateless-4v6-motivation-01.
2.4.1 xxxx
2.4.2 xxxx

3 Conclusions
Note: I suggest to give the explicit conclusion, which approach is
preferred and which has high-priority considering particular demands
from operators.


> and the stateless issues part of the draft into draft-dec-stateless-4v6-01

I support this idea.
_______________________________________________
Softwires mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/softwires

Reply via email to