How risky was this change?  I need to take a build out to test with some of
my patches that are near the tip and I am looking for a reasonable last
point and most of the builds this month have been ok for me and then this
popped into the commit list.

Any thoughts?  Where does Lucene 2.9 put the risk level for trying to get
more testing hours in on 1.4 and yet be stable at the same time?

--j
-- 
View this message in context: 
http://www.nabble.com/How-risky-was-rev-774049-updated-to-Lucene-2.9--tp23527874p23527874.html
Sent from the Solr - Dev mailing list archive at Nabble.com.

Reply via email to