South Sudan Starts Pumping Oil At 10,000 Barrels Per Day
The South Sudanese Minister of Petroleum and Mining, Stephen Dhieu Dau
has announced that oil has started flowing at 10,000 barrels per day
from the Tarjas oil field in Unity State.
08 April 2013

The Minister of Petroleum and Mining, Stephen Dhieu Dau. Sudan and
South Sudan agreed last month to resume oil production. South Sudan
previously produced 350,000 barrels a day. [Gurtong | File]
By Misuk Moses Mule

JUBA, 8 April 2013 [Gurtong]- On Saturday, the government launched the
resumption of the oil flow in Tarjas, Unity state as part of the
implementation matrix reached last month with Sudan.

“The production of Tarjas is normal but with the delay in Unity Oil
fields, we will be producing 10,000 barrels per day,” he said.

In Unity oil field which is located in northern Unity State, Torkonam
and Pariang Counties, the minister says that the technical
preparations are going on well.

“Fifty percent may be ready for the resumption in the next few days
but another 50 will need some more weeks to be brought back to the
production level that is in Unity oil field particularly in the oil
field in Pariang County,” the minister added.

He says that they are expecting the resumption of oil in Upper Nile by
20th April but not beyond that.

He added that the money from the oil is expected to be collected by June.

“Regarding the first money and the marketing of the crude, we will be
starting marketing the crude at the end of May and the money will be
collected around the end of June or the 1st of July,” Dhieu told the
media.

In Upper Nile, Dhieu said he visited Paloch oil field and that the
technical readiness is 100% with integrity assessment of the pipeline
taking place.

“The only thing that will be completed in the next few days is the
pipeline integrity assessment. People are working to check the
pipeline from Paloch pump station one to the central processing
facility in Jeblin,” he said adding that, “Upper Nile used to produce
250,000 barrels and from beginning we will start gradually may be from
around 180,000 and within one or two months, it will come to normal
level of production before the shutdown.”

About the Lamu- Project, he says the government is still doing its own
feasibility studies.

Toyota, a Japanese company did a feasibility study but the minister
says that they will do an independent study.

He says the flow of oil is a sign of peace between the two neighbours
and that they are showing that they have opened a new page.

The minister added that the flow of the oil will benefit the two
countries of Sudan and South Sudan.

According to him, the flow of oil means improvement in service
delivery to the people of South Sudan.

South Sudan shut down its oil production in January 2012 after failing
to agree with Khartoum over oil fees, throwing both nations into
turmoil.
After months of negotiations, Sudan and South Sudan agreed last month
to resume oil production. South Sudan previously produced 350,000
barrels a day and the oil shutdown threw both countries into economic
and political turmoil.


Posted in: Home, Business, Foreign Relations

-- 
You received this message because you are subscribed to the Google Groups 
"South Sudan Info - The Kob" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to