Sudan says Egypt requested postponement of tripartite meeting on Ethiopian
dam

   - Article <http://www.sudantribune.com/spip.php?article57133#tabs-1>
   - Comments (0) <http://www.sudantribune.com/spip.php?article57133#tabs-2>

[image: email] Email
<http://www.sudantribune.com/spip.php?iframe&page=enviar_email_articulo&id_article=57133>
[image: print] Print
<http://www.sudantribune.com/spip.php?iframe&page=imprimable&id_article=57133>
[image: pdf]Save
<http://www.sudantribune.com/spip.php?page=spipdf&spipdf=spipdf_article&id_article=57133&nom_fichier=article_57133>
[image: separation]
[image: increase] <http://www.sudantribune.com/spip.php?article57133#>
[image: decrease] <http://www.sudantribune.com/spip.php?article57133#>
[image: separation]
[image: separation]

   - [image: Inline image 1]
   
<http://www.facebook.com/sharer/sharer.php?u=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57133&t=Sudan%20says%20Egypt%20requested%20postponement%20of%20tripartite%20meeting%20on%20Ethiopian%20dam%20%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan>
   - [image: Inline image 2]
   
<http://www.myspace.com/Modules/PostTo/Pages/?u=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57133&t=Sudan%20says%20Egypt%20requested%20postponement%20of%20tripartite%20meeting%20on%20Ethiopian%20dam%20%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan>
   - [image: Inline image 3]
   
<http://twitter.com/share?text=Sudan%20says%20Egypt%20requested%20postponement%20of%20tripartite%20meeting%20on%20Ethiopian%20dam%20%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan&url=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57133>
   - [image: Inline image 4]
   
<http://buzz.yahoo.com/submit?submitUrl=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57133&submitHeadline=Sudan%20says%20Egypt%20requested%20postponement%20of%20tripartite%20meeting%20on%20Ethiopian%20dam%20%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan&submitSummary=%20November%2022%2C%202015%20%28KHARTOUM%29%20%E2%80%93%20The%20Sudanese%20minister%20of%20Water%20Resources%20and%20Electricity%20Moatez%20Moussa%20said%20today%20that%20the%20tripartite%20meeting%20with%20%28...%29%20>

------------------------------

November 22, 2015 (KHARTOUM) – The Sudanese minister of Water Resources and
Electricity Moatez Moussa said today that the tripartite meeting with his
counterparts in Egypt and Ethiopia on the Grand Renaissance Dam (GERD)
which was scheduled for late November in Khartoum was postponed to a later
date at the request of the Cairo.
[image: JPEG - 10.5 kb]*Egypt fears that Ethiopia’s $4.6 billion hydropower
plant on the Blue Nile will diminish its share of water resources (Photo:
Reuters/Amr Abdallah Dalsh)*

The controversial dam being built on the Blue Nile, about 20 kilometers
from the Sudanese border, has a storage capacity of 74 billion cubic meters
with the potential to generate 6,000 megawatts of electricity.

Egypt fears that the construction of the $4.3 billion dam will diminish its
water share which is a source of water to millions people of the desert
nation. It has fiercely sought to sway Ethiopia from its plans with no
success.

Sudan eventually gave its blessings to the dam drawing the irk of the
Egyptian government.

Moussa said that Egypt wanted to merge this meeting with a separate one
that brings together the foreign ministers of the same countries.

He stressed that the delay was warranted by scheduling issues related to
the foreign ministers and no other reasons.

Some Egyptian newspapers accused Sudan of postponing the meeting in
retaliation to tensions between the two countries over alleged mistreatment
of Sudanese nationals in Egypt.

The meeting is supposed to be held in the presence of the two French and
Dutch consultancy firms to reconcile their convergent views with regard to
the mechanisms of implementation of the required studies.

The three countries will also discuss contingency plans in the absence of
agreement between the firms which would include picking new ones and
restarting the selection process all over again.

The three countries had previously formed a committee to select a
consultancy firm to assess the impact of GERD on Sudan and Egypt.

During the 9th round of negotiations held in Cairo earlier this month,
Egypt handed the Ethiopian side a list of its observations on the dam
officially which focused mainly on the acceleration of the dam construction
while slowing down the negotiations which would not allow for the
implementation of the recommendations of the consultancy firms.

(ST)

-- 
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
Visit this group at https://groups.google.com/d/forum/southsudankob
View this message at 
https://groups.google.com/d/msg/southsudankob/topic-id/message-id
For more options, visit https://groups.google.com/d/optout
--- 
You received this message because you are subscribed to the Google Groups 
"South Sudan Info - The Kob" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/SouthSudanKob.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/SouthSudanKob/CAJb14oqcz-HdenBZ4W-OU95d7yJA184KzFM7Rj5TD8WD_1n1Gw%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to