Ethiopia dismisses Egyptian media reports on Renaissance Dam
Article
Comments (0)
email Email
print Print
pdfSave
separation
increase
decrease
separation
separation
facebookmyspacetwitterbuzzyahoo
January 2, 2016 (KHARTOUM) - Ethiopian Minister of Water Resources and
Energy Motuma Mekasa has denied Egyptian media report saying that
Ethiopia had built a reservoir for the Renaissance Dam stressing his
country would not stop the construction works.
JPEG - 19.2 kb
The planned Grand Ethiopian Renaissance Dam project (AP)
In a statement to the Ethiopian DireTube video sharing site, Mekasa
said the filling of the dam is part of the construction works,
describing the Egyptian media reports on the filling as “incorrect”.
“The construction works of the dam project are ongoing and wouldn’t
stop and it will be filled according to the timetable of the
construction,” he said.
The Ethiopian minister pointed that the consultancy firms which were
agreed upon by Sudan, Egypt and Ethiopia to conduct the technical
studies on the dam will begin their work in early February.
“The French consultancy firms would conduct their studies while the
construction work is ongoing. The construction work is going according
to the plan,” he said.
He said the invitation extended to the foreign and irrigation
ministries in Sudan and Egypt by the Ethiopian foreign ministry to
visit the Renaissance Dam comes within the framework of the good
intentions and trust building among the three nations, noting the
Sudanese and Egyptians ministers welcomed the invitation.
Following the eleventh meeting of the tripartite committee on the dam
last week in Khartoum, the ministers of irrigation and foreign affairs
of Sudan, Egypt and Ethiopia signed a document including several
agreements pertaining to the Ethiopian Renaissance Dam.
The three parties reached an agreement on the consultancy firms which
would conduct the technical studies on the dam, noting that the French
Artelia and BRL groups have been selected to undertake the dam impact
studies.
The multi-billion dollar dam is being constructed on the Blue Nile,
about 20 kilometres from the Sudanese border, and has a capacity of 74
billion cubic meters, and is expected to generate electrical power of
up to 6,000 megawatts.
Egypt is concerned that the dam could reduce its quota of 55.5 billion
cubic meters of the Nile water, while the Ethiopian side maintains
that the dam is primarily built to produce electricity and will not
harm Sudan and Egypt.
(ST)
--
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
Visit this group at https://groups.google.com/d/forum/southsudankob
View this message at
https://groups.google.com/d/msg/southsudankob/topic-id/message-id
For more options, visit https://groups.google.com/d/optout
---
You received this message because you are subscribed to the Google Groups
"South Sudan Info - The Kob" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/SouthSudanKob.
To view this discussion on the web visit
https://groups.google.com/d/msgid/SouthSudanKob/CAJb14or5Gdd30Eij1G2OkgKiUNVHHH1jc1SxrvoyqRrp-oLS6Q%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.