Spacewalk 1.7.   Did this change in 1.8?

> Date: Fri, 23 Nov 2012 15:51:35 +0100
> From: [email protected]
> To: [email protected]
> Subject: Re: [Spacewalk-list] can't add systems to SSM from Schedule tab
> 
> On Wed, Oct 31, 2012 at 11:01:11AM -0400, Giovanni Torres wrote:
> > I'm asking whether this behaviour is by design:
> > I selected all servers and managed them through SSM.  I then ran a remote 
> > command.  Those that have OSAD working responded almost immediately.  
> > Great. Those that do not have their task marked as pending. Not so great.
> > I go to the Schedule tab and look for my arbitrary script action and see on 
> > the right that I have a number of systems in the Pending status.   When I 
> > click on the link corresponding to the number of pending systems, it will 
> > take me to a page that lists these pending systems.
> > Now, if I select all the pending systems listed on this page, I am unable 
> > to manage them through SSM.  The panel at the top says "No Systems 
> > Selected" even though all the systems on this page are selected.
> > Is there a reason why I can't add systems to SSM from this page?
> 
> What Spacewalk version is this?
> 
> -- 
> Jan Pazdziora
> Principal Software Engineer, Satellite Engineering, Red Hat
> 
> _______________________________________________
> Spacewalk-list mailing list
> [email protected]
> https://www.redhat.com/mailman/listinfo/spacewalk-list
                                          
_______________________________________________
Spacewalk-list mailing list
[email protected]
https://www.redhat.com/mailman/listinfo/spacewalk-list

Reply via email to