On 3.2.2016 22:51 Pierre Casenove wrote:
Hello,
I have a spacewalk 2.4 server running on RHEL 6 Server, with PGSQL 8.4
local database.
I have several repository syncs scheduled during the night.
I've noticed that since the 2.4 upgrade, if a first schedule is still
running when a second is supposed to be launch, this second repository
sync is simply skipped and never launched, even when schedule 1 is
completed.
For exemple:
Centos 6 Base scheduled at 8pm
Centos 7 Base scheduled at 8.30pm
If centos 6 base hasn't been ended before 8.30pm, centos 7 Base is
simply skipped.

I'm pretty sure that before 2.4 upgrade, the second schedule was
launched as soon as the first one ended.

Am I totally wrong? If so, how can I configure spacewalk to be sure that
each reposync are lunched each night?

Thanks in advance,

Pierre



Hello,

this bug has been fixed and updated spacewalk-java packages for 2.4 version should be in the repo. Please try to update.

Regards,
--
Jan Dobes
Satellite Engineering, Red Hat

_______________________________________________
Spacewalk-list mailing list
[email protected]
https://www.redhat.com/mailman/listinfo/spacewalk-list

Reply via email to