Hi, recently i removed some obsolete channels from our spacewalk 2.6 system.
No I do get a lot of messages that some repo-sync fails.
Taskomatic bunch repo-sync-bunch was scheduled to run within the
repo-sync-1-110 schedule.
Subtask repo-sync failed.
I tried to google a solution and found some hints from the RH Knowledge
Base to remove the schedule with a tool spacewalk-api, but I dont have
that installed and no Idea where to get it.
Any hints how to solve that?
Thanks and regards . Götz
smime.p7s
Description: S/MIME Cryptographic Signature
_______________________________________________ Spacewalk-list mailing list [email protected] https://www.redhat.com/mailman/listinfo/spacewalk-list
