http://bugzilla.spamassassin.org/show_bug.cgi?id=3523
------- Additional Comments From [EMAIL PROTECTED] 2004-06-20 18:24 ------- I'm not sure if this is related or should be entered as a new bug, but it would be nice when building a prerelease if the RPM revision were made a fraction less than 1 (eg. pre1 becomes 0.1, pre2 becomes 0.2, etc.) so that upgrades from prereleases to final work as expected (eg. 3.0.0-0.1 to 3.0.0-1). ------- You are receiving this mail because: ------- You are the assignee for the bug, or are watching the assignee.
