http://bugzilla.spamassassin.org/show_bug.cgi?id=3523





------- Additional Comments From [EMAIL PROTECTED]  2004-06-20 18:24 -------
I'm not sure if this is related or should be entered as a new bug, but it would
be nice when building a prerelease if the RPM revision were made a fraction less
than 1 (eg. pre1 becomes 0.1, pre2 becomes 0.2, etc.) so that upgrades from
prereleases to final work as expected (eg. 3.0.0-0.1 to 3.0.0-1).



------- You are receiving this mail because: -------
You are the assignee for the bug, or are watching the assignee.

Reply via email to