Hi all,

Spanning Sync v3.0.2 is now available. You can download it from:

http://spanningsync.com/download

Here's what changed:

        •       Removing a recurrence rule's "until" date from Google Calendar 
now
syncs to iCal
        •       Fixed a problem that could cause the sync to loop if the "sync
events older than N days" option was on
        •       Changing an event so that it's not "all day" wasn't syncing in 
some
cases
        •       Trickle syncs are faster
        •       Exchange calendars will sync as read-only
        •       CalDAV calendars weren't showing up as read-only, now they are
        •       The sync app was crashing in some cases
        •       Trickle syncs are now delayed by 10 seconds and coalesced
        •       Some errors sent from the server weren't being displayed
        •       Spanning Sync will now abort if Apple Sync Services doesn't 
respond
within 10 minutes

Thank you to everyone who participated in the beta testing cycle. If
you emailed a beta report but didn't get a response from me, please
contact me again at [email protected]. Apparently some emails
sent out of our support system did not get back to the originator.
--
Larry Hendricks
[email protected]
http://spanningsync.com

--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"Spanning Sync" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/spanningsync?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to