The 3/4" pipe was allowed in pipe schedule systems prior to 1940. After that
the minimum is 1"

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Lorrie
Dierdorff
Sent: Tuesday, January 16, 2007 1:16 PM
To: [email protected]
Subject: 3/4" steel pipe

Was 3/4" steel pipe allowed back in the day?
What year?  Pre 1975?
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum


_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to