I am working on a retrofit project (church) that is requiring a dry system. I am looking at the using the room design method for my calcs. Is there any reason that this will not work for a dry system? The only thing I can find is a line in the annex that says the increases or decreases allowed or required by 11.2.3.2 do not apply. This would tend to make one think that using this in a dry system is acceptable.
What think ye? Cliff Whitfield Fire Design, Inc. 3784 Holly Ridge Trail Marianna, FL 32448 _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
