Did the Cal-Val work OK with the flow from the inspector's test?

At 03:19 PM 1/18/2008, you wrote:
Off Standpipe (in direction of flow):
BV - Cla-Val - Tee (to FDV) - BV - CHV - WFS - T&D (to Spkrs.)

Worked well.
Tom


Tom,
Is the BF before the Cla-Val required or was it installed in case there
is maintenance required on the Cla-Val and not to shut down the feed?


_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Todd G. Williams, PE
Fire Protection Design/Consulting
Stonington, Connecticut
www.fpdc.com
860.535.2080 _______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to