The City of Atlanta does, at least they have in the past.  With all the
budget cuts things may change.

The inspector usually looks at the gauge and takes a quick look (a bit
less than two hours) at the system then signs the test certificate.
Ceiling type makes no difference.  

Bobby McCullough
Allsouth Sprinkler

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Chris
Cahill
Sent: Monday, July 14, 2008 4:48 PM
To: [email protected]
Subject: Rough-in inspections

Any AHJ's requiring 200 psi hydrostatic tests to be done during the
rough-in
inspection?  Not really a problem with ACT ceilings.  Certainly ties
things
up in vertical residential systems where you can't zone it.  

 

Chris Cahill, P.E.
Fire Protection Engineer
Sentry Fire Protection, Inc.
763-658-4483
763-658-4921 fax
Email: [EMAIL PROTECTED]
Mail: P.O. Box 69
        Waverly, MN 55390
Location: 4439 Hwy 12 SW
              Waverly, MN 55390
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to