The City of Atlanta does, at least they have in the past. With all the budget cuts things may change.
The inspector usually looks at the gauge and takes a quick look (a bit less than two hours) at the system then signs the test certificate. Ceiling type makes no difference. Bobby McCullough Allsouth Sprinkler -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Chris Cahill Sent: Monday, July 14, 2008 4:48 PM To: [email protected] Subject: Rough-in inspections Any AHJ's requiring 200 psi hydrostatic tests to be done during the rough-in inspection? Not really a problem with ACT ceilings. Certainly ties things up in vertical residential systems where you can't zone it. Chris Cahill, P.E. Fire Protection Engineer Sentry Fire Protection, Inc. 763-658-4483 763-658-4921 fax Email: [EMAIL PROTECTED] Mail: P.O. Box 69 Waverly, MN 55390 Location: 4439 Hwy 12 SW Waverly, MN 55390 _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)