Can anyone tell me WHY there is a 5x safety factor for hanger loading, BUT not
for the point of connection to the structure??
It seems to me these requirements should be the same. What good is the upsized
load for the hanger, if the structure can't hold the hanger!?
(NFPA 2007 sec. 9.1.1.2(1) vs. 9.2.1.3.1)
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]
To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)