Absolutely not. Pipe sizes should be shown per NFPA. Look in the index under working Drawings. There is a list of requirements, then show that to the Plan Reviewer. How else can he verify hydraulic Calcs?
-----Original Message----- From: Gary Stites <[email protected]> To: [email protected] Sent: Fri, 17 Jul 2009 10:11:07 -0700 Subject: Reflected Ceiling Plan I have a plan checker that is requiring a ceiling plan that shows sprinklers only, no pipe. I've heard rumors that this is required in NFPA #13 2002, but I cannot find it. Is this required on working drawings? _______________________________________________ Sprinklerforum mailing list http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)