We have an engineered design (by a registered PE) that has a glass atrium
wall in  a LEEDS building. I am assuming some of you guys have already
dealt with this. He has called for SSP heads  - not listed window
sprinklers - on both sides of the wall.

He is fuzzy in his logic for calculating them however and frankly so am I.
One side is 3 floors of glass so it is one huge compartment, the other side
is split into offices, so there are only 1-3 window sprinklers in each
room.

How do we calc the atrium on the big room side - as a water curtain
balanced with the OH system?

In the small rooms, do we just do a most demanding room calc and include
the window sprinklers?

Thanks for the help.
Greg

-- 
Greg McGahan
Living Water Fire Protection, LLC <http://www.livingwaterfp.com>
1160 McKenzie Road
Cantonment, FL 32533
850-937-1850
fax 850-937-1852
-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20111219/63ce58f2/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to