I think it dates back to mid 70's.

Arthur Tiroly
ATCO Fire Protection Design


-----Original Message-----
From: [email protected]
[mailto:[email protected]] On Behalf Of David
Autry
Sent: Monday, May 13, 2013 1:36 PM
To: [email protected]
Subject: RE: Warehouse protection

1980 231C has it.


David Autry

Meininger Fire Protection Inc.
2521 W L St. Suite No.4
Lincoln, Ne 68522
Voice (402) 466-2616
Fax (402) 466-2617
[email protected]

-----Original Message-----
From: [email protected]
[mailto:[email protected]] On Behalf Of Art
Tiroly
Sent: Monday, May 13, 2013 12:33 PM
To: [email protected]
Subject: RE: Warehouse protection

I need some history on warehouse protection requirements.

When was high piled storage protection with hydraulic calculations required?

That was covered in NFPA 231 back then.

The problem is a 22 ft high building with a 1975 - 130 SF pipe schedule
system and a 45 psi water supply for class 3 and 4 racks to 19 ft.

Arthur Tiroly
ATCO Fire Protection Design
Tiroly and Associates
24400 Highland Rd rm 25, CLE 44143
216-621-8899
216-570-7030 Cell
WWW.ATCOfirepro.com

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.o
rg
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org



-----
No virus found in this message.
Checked by AVG - www.avg.com
Version: 2012.0.2241 / Virus Database: 3162/5820 - Release Date: 05/13/13

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to