I see this quite a bit in apartment buildings.   We test the flow switch/bell 
through the ITC first. Then we test the A/F solution.  

-----Original Message-----
From: Sprinklerforum [mailto:[email protected]] On 
Behalf Of Douglas Hicks
Sent: Tuesday, August 04, 2015 8:23 PM
To: [email protected]
Subject: Residential sprinkler IT&M ?

We have several Residential group homes we inspect. The residents are 
developmentally challanged.  Some of these homes have basements , ground floor 
only, 2 story and 2 story with a basement.  Basements may or may not be 
occupied by residents at different times.   One has a fire alarm systems,  the 
rest have single station alarms.   About 1/2 have antifreeze systems, and no 
way to test the antifreeze protection.  Piping is plastic and copper, plastic 
and iron, or all copper.  None have isolation valves between the backflows and 
the downstream piping. 

  Is there a standard other than 25 for testing and inspection? 

Douglas Hicks
General Fire Equipment Co of Eastern Oregon, Inc 
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to