What is supporting the T&G?
Todd G Williams, PE
Fire Protection Design/Consulting
Stonington, CT
860-535-2080 (tel:860-535-2080) (ofc)
860-553-3553 (tel:860-553-3553) (fax)
860-608-4559 (tel:860-608-4559) (cell)
>
> On Jun 14, 2017 at 11:14 AM, <Brian Harris
> (mailto:[email protected])> wrote:
>
>
>
>
>
> Looking for opinions on a project we’re bidding. It’s an old rectangle shape
> school building that has concrete joist crossing the building with tongue &
> grove wood decking. Most of the rooms have a sloped ACT ceiling that’s
> approximately 6”-8” down from the deck. Any thoughts on protecting the deck?
> (see link for pic’s)
>
>
>
>
>
>
>
> https://www.dropbox.com/sh/7mwoppgmu5aq27e/AADOdqgkge40MHXeUsex9RHSa?dl=0
>
>
>
>
>
>
>
> Brian Harris, CET
>
>
>
> BVS Systems Inc.
>
>
>
> Design Manager
>
>
>
> bvssystemsinc.com (http://bvssystemsinc.com/)
>
>
>
> Phone: 704.896.9989
>
>
>
> Fax: 704.896.1935
>
>
>
>
>
>
> _______________________________________________ Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org