Do you have a staff person who makecircuit  of FP’s offices? You might get 
lucky on some of them. 

The code term for AFA is ‘Record’ drawings. It’s long been a requirement in 72. 
Yes, I’ve more than once literally been called a Bolshevik for requiring them. 

Das vadanya, Comrade.

Bruce Verhei 

> On Jun 14, 2018, at 17:06, John Paulsen <[email protected]> wrote:
> 
> Is this a JCAH (Joint Commission) requirement?
> 
> John Paulsen 
> Crown Fire System Design 
> 
> Get Outlook for Android
> 
>  
> From: Sprinklerforum <[email protected]> on 
> behalf of Mark Eckard <[email protected]>
> Sent: Thursday, June 14, 2018 7:56:26 PM
> To: [email protected]
> Subject: As built drawings
>  
> I have a customer who is a chain medical facility. There is an association 
> that is requiring them to produce as-built drawings for the sprinkler and 
> alarm systems as well as associated calculations and acceptance test 
> certificates. 
> Now, here's the situation. All of the facilities are located in multi-tenant 
> buildings (16 tenants or more) in 20 to 30 year buildings. 
> I propose doing as-builts and calls for the facility's suite only. Would love 
> to hear some opinions... 
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to