Cross Laminated Timber (CLT) or mass timber for high rise continues to 
successfully move through the ICC code adoption process.

Here is a report that is being used to support effort. Of note to a passel of 
sprinkler practitioners is Test #5. Test fires #1-4 were non-sprinklered. Test 
#6 was with sprinkler protection.  Test #5 provided sprinklers, with water 
supply shut off. In 20 minutes valve turned on. Goal was to simulate system 
o/s, fire department gets on scene, figures out not water flow, and pumps FDC. 

Best.

Bruce Verhei 

http://media.iccsafe.org/code-development/final-report-fpl.pdf

_______________________________________________
Sprinklerforum mailing list
Sprinklerforum@lists.firesprinkler.org
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to