Hello All,
We're retrofitting a double check into an existing pipe scheduled system.
In looking at NFPA 13 (2019) edition 19.3.2.1 in order to do this we just
need a hydrant flow test and then subtract the friction losses of the
double check and the friction loss due to elevation of the highest
sprinkler from the flow test and make sure the leftover pressure is greater
than the value of 19.3.2.1. Is that correct?

JH
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to