hiya all, I've been giving my branch a good hammering on our production squids and so far its been stable. About all that needs doing now is the delayed reads stuff, but if I can't get it done by now I'll have it done in two weeks (just after exams.)
Is there any timeframe on the actual branching of squid-2.5 to squid-2.6 ? I'd like to know roughly how much time I have. Thanks, Adrian
