> Lets set a date: 29 September?
>
> Well, I'll call for a partial hold right now. Please only commit bug
> fixes, minor cleanups, and features already on the roadmap for 3.1.
> The rest can be queued for commit post branch.
>


5 days to go and these bits left....

* connection pinning
  I thinking it's been outstanding long enough we should get it into 3.1,
even if we have to hold PRE1 a week after the branch to stabilize it (or
test it in PRE1 ?).


Awaiting merge. (1-2 days).

* kerberos helper
  Markus has supplied another set of code, I assume its been tested
externally and just needs a drop-in.


Awaiting re-submission with some alterations. Non-blocker.

* eCAP


Awaiting merge submission.

* source layout


Started. Non-blocker.

* source formatting
  scripts committed for use already, I was planning on starting the
re-format and testbed run today here.

Now waiting on completion of other feature code.


Other misc stuff which qualifies but need some work if people have time:

Awaiting a verify:
  http://www.squid-cache.org/bugs/show_bug.cgi?id=2433

Awaiting a verify test and debug:
  http://www.squid-cache.org/bugs/show_bug.cgi?id=2393

Awaiting a developer:
 * testbed   level-02-maximus.opts
opposite of minimal. Everything enabled, leave configure to handle clashes properly etc.

Amos
--