Thanks for the review Eric! I am drooling while saving my dough for one. ~Gary Lane www.angelfire.com/or/trainguy
----- Original Message ----- From: "Eric Maschwitz" <[EMAIL PROTECTED]> To: "Multiple recipients of sslivesteam" <[EMAIL PROTECTED]> Sent: Saturday, June 08, 2002 4:46 PM Subject: Accu. MIch Cal Shay > Got mine today. Serial No. 13 (lucky 13.) She sure is a beauty. > > The first run went well. Steam time of at least 20 minutes, really quiet > burner, LOTS of power/tractive effort and a good slow speed. > > There are some nice features on the production model that were not on Accu's > pre prod. model. These include a blow down and a water drain for the > lubricator. The blow down is supplied separately and you must install it if > you want to use it. > > The trucks come in a small cardboard box and must be installed with a > flathead screw driver. The engine is packed in Accu's usual metal cradle > like the C-16. > > So far I am very, very pleased. This engine is indeed a bargain!! > > > -Eric Maschwitz > www.grabiron.com > >
