On 7/19/12 1:40 PM, Kevin Smith wrote: > On Thu, Jul 19, 2012 at 8:18 PM, Mark Rejhon <[email protected]> wrote:
>>>> -- Since you are the primary author -- when do you plan to execute a >>>> LAST >>>> CALL for XEP-0308? >>> I'm not opposed to requesting one ~=now, if it's useful. >> It's been less than 12 months since the spec was granted a number. As long >> as XEP-0001 rules allows it, then this could be a pretty quick LAST CALL for >> an XEP. > > To the best of my knowledge, nothing in XEP-0001 says we need to leave > a XEP at Experimental for 12 months before moving it to Draft > (although 12 months /is/ the period after which an inactive > Experimental XEP gets automatically deferred). Correct! >> If we can agree to call a simultaneous LAST CALL before the end of this >> month (I was hoping for earlier, but there's been so much discussion), so we >> can bring both 0301 and 0308 to Draft status roughly simultaneously -- I >> will go ahead and immediately add the 'id' parameter to XEP-0301. > > I'm happy to ask for LC on 308. Sounds like a good idea. /psa
