Git master
Platform Mac

If we have a gas switch at 6m and choose last stop at 6m we get the gas switch 
event and the deco stop as two separate entries in the final plan.

Thera are some other issues related to gas switch events as well, look at the 
table below.

EAN50 switch depth 22m
depth
runtime
duration
gas
50m
2min
2min
(21/35)
50m
30min
28min
 
22m
34min
4min
EAN50
21m
35min
1min
 
18m
37min
1min
 
15m
39min
2min
 
12m
43min
3min
 
9m
48min
5min
 
6m
49min
1min
EAN100
6m
60min
11min
 
0m
66min
6min
 

The above table tells us that we hav a gas switch a 22m with a total stop time 
of 4min.

If the gas switch is set to occur at 21m the 4min stop at 22m disappears and we 
only have a 1min stop at 21m.

For some reason the stop time reported at 22m are actually the calculated 
ascent time.



Looking at the output of the Verbatim dive plan we have transitions leading up 
to gas switch events and surfacing even if we choose not to show transitions.

Stay at 50 m for 27:00 min - runtime 30:00 on (21/35)
Transition to 22 m in 3:53 min - runtime 33:53 on (21/35) <— This transition 
disappears if the switch depth is set to 21m.
Switch gas to EAN50
Stay at 21 m for 1:00 min - runtime 35:03 on EAN50
Stay at 18.0 m for 1:00 min - runtime 36:33 on EAN50
Stay at 15.0 m for 2:00 min - runtime 39:03 on EAN50
Stay at 12.0 m for 3:00 min - runtime 42:33 on EAN50
Stay at 9.0 m for 4:00 min - runtime 47:03 on EAN50
Transition to 6.0 m in 0:30 min - runtime 47:33 on EAN50 <---
Switch gas to EAN100
Stay at 6.0 m for 11:01 min - runtime 58:34 on EAN100
Transition to 0.0 m in 6:15 min - runtime 64:49 on EAN100 <---


//Jocke

_______________________________________________
subsurface mailing list
[email protected]
http://lists.hohndel.org/cgi-bin/mailman/listinfo/subsurface

Reply via email to