Git master Platform Mac If we have a gas switch at 6m and choose last stop at 6m we get the gas switch event and the deco stop as two separate entries in the final plan.
Thera are some other issues related to gas switch events as well, look at the table below. EAN50 switch depth 22m depth runtime duration gas 50m 2min 2min (21/35) 50m 30min 28min 22m 34min 4min EAN50 21m 35min 1min 18m 37min 1min 15m 39min 2min 12m 43min 3min 9m 48min 5min 6m 49min 1min EAN100 6m 60min 11min 0m 66min 6min The above table tells us that we hav a gas switch a 22m with a total stop time of 4min. If the gas switch is set to occur at 21m the 4min stop at 22m disappears and we only have a 1min stop at 21m. For some reason the stop time reported at 22m are actually the calculated ascent time. Looking at the output of the Verbatim dive plan we have transitions leading up to gas switch events and surfacing even if we choose not to show transitions. Stay at 50 m for 27:00 min - runtime 30:00 on (21/35) Transition to 22 m in 3:53 min - runtime 33:53 on (21/35) <— This transition disappears if the switch depth is set to 21m. Switch gas to EAN50 Stay at 21 m for 1:00 min - runtime 35:03 on EAN50 Stay at 18.0 m for 1:00 min - runtime 36:33 on EAN50 Stay at 15.0 m for 2:00 min - runtime 39:03 on EAN50 Stay at 12.0 m for 3:00 min - runtime 42:33 on EAN50 Stay at 9.0 m for 4:00 min - runtime 47:03 on EAN50 Transition to 6.0 m in 0:30 min - runtime 47:33 on EAN50 <--- Switch gas to EAN100 Stay at 6.0 m for 11:01 min - runtime 58:34 on EAN100 Transition to 0.0 m in 6:15 min - runtime 64:49 on EAN100 <--- //Jocke
_______________________________________________ subsurface mailing list [email protected] http://lists.hohndel.org/cgi-bin/mailman/listinfo/subsurface
