Robert, care to explain the postponed logic? This set is from master.
Transition to 30 m in 1:40 min - runtime 1:40 on EAN32 Stay at 30 m for 28:20 min - runtime 30:00 on EAN32 Switch gas to air Stay at 30 m for 30:00 min - runtime 60:00 on air Switch gas to EAN32 Stay at 30 m for 30:00 min - runtime 90:00 on EAN32 Switch gas to EAN80 Stay at 9.0 m for 6:00 min - runtime 99:39 on EAN80 Stay at 6.0 m for 9:00 min - runtime 109:39 on EAN80 Stay at 3.0 m for 17:00 min - runtime 128:12 on EAN80 Transition to 0.0 m in 1:33 min - runtime 129:45 on EAN80 depth duration runtime gas 30m 2min 2min EAN32 30m 28min 30min 30m 30min 60min EAN32 30m 30min 90min 9m 10min 100min 6m 10min 110min EAN80 3m 19min 128min 0m 2min 130min If we ignore the check for postponed on line 653 - 655 of planner.c this is the corresponding planner notes. This looks much more like what I would expect from the verbatim notes on top. depth duration runtime gas 30m 2min 2min EAN32 30m 28min 30min air 30m 30min 60min EAN32 30m 30min 90min 9m 10min 100min EAN80 6m 10min 110min 3m 19min 128min 0m 2min 130min Another thing, if the stop time is less than 1min at the switch depth the switch is displayed at the correct depth. depth duration runtime gas 40m 2min 2min (24/25) 40m 23min 25min 9m 6min 31min 9m 1min 32min 6m 1min 33min 6m 22min 55min 0m 3min 58min depth duration runtime gas 40m 2min 2min (24/25) 40m 23min 25min 9m 6min 31min EAN80 6m 8min 39min 0m 3min 42min 2min stoptime @9m == wrong switch depth. depth duration runtime gas 40m 2min 2min (24/25) 40m 24min 26min 9m 6min 32min 9m 2min 34min 6m 1min 35min 6m 24min 59min 0m 3min 62min depth duration runtime gas 40m 2min 2min (24/25) 40m 24min 26min 9m 7min 33min 6m 8min 41min EAN80 0m 3min 44min /Jocke
_______________________________________________ subsurface mailing list [email protected] http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
