>> >> >> Transition to 30 m in 1:40 min - runtime 1:40 on EAN32 >> Stay at 30 m for 28:20 min - runtime 30:00 on EAN32 >> Switch gas to air >> Stay at 30 m for 30:00 min - runtime 60:00 on air >> Switch gas to EAN32 >> Stay at 30 m for 30:00 min - runtime 90:00 on EAN32 >> Switch gas to EAN80 >> Stay at 9.0 m for 6:00 min - runtime 99:39 on EAN80 >> Stay at 6.0 m for 9:00 min - runtime 109:39 on EAN80 >> Stay at 3.0 m for 17:00 min - runtime 128:12 on EAN80 >> Transition to 0.0 m in 1:33 min - runtime 129:45 on EAN80 >> > > I think there is no problem with the verbatim plan.
That looks fine. > > >> >> depth >> duration >> runtime >> gas >> 30m >> 2min >> 2min >> EAN32 >> 30m >> 28min >> 30min >> >> 30m >> 30min >> 60min >> EAN32 >> 30m >> 30min >> 90min >> >> 9m >> 10min >> 100min >> 6m >> 10min >> 110min >> EAN80 >> 3m >> 19min >> 128min >> >> 0m >> 2min >> 130min >> >> > > This is wrong on many levels: Displaying EAN32 twice is of course nonsense, > the second segment should be air and EAN80 should be printed on the 9m line, > not at 6m. The deep segments should look like this: depth duration runtime gas 30m 2min 2min EAN32 30m 27min 29min 30m 1min 30min air 30m 29min 59min 30m 1min 60min EAN32 30m 29min 89min I had to insert one minute segments where the gas switch happens for it to be displayed correctly. Interestingly if I build the entire plan up until 9m including the stop times and gas switches it still gets it wrong. depth duration runtime gas 30m 2min 2min EAN32 30m 27min 29min 30m 1min 30min air 30m 29min 59min 30m 1min 60min EAN32 30m 29min 89min 15m 2min 91min 9m 3min 94min EAN80 9m 1min 95min 9m 4min 99min 6m 28min 127min 0m 3min 130min Gas switch to EAN80 is specified during the 1min event at runtime 95min, now it gets printed to early. /Jocke
_______________________________________________ subsurface mailing list [email protected] http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
