In CCR dive planning, allowing for sufficient gas volume depends on a
knowledge of which gas sources are used CC and which gas sources are
used for bailout (=OC). For CCR, bailout is indicated by a 1-minute dive
segment with setpoint of 0 and subsequent gas use calculations are
performed assuming open circuit. In the case of SCR, a setpoint makes no
sense and I cannot find a way to signify a switch to OC: gas consumption
is calculated assuming the dilution ratio specified in the preferences.
Is there a way to get around this?
Kind regards,
willem
--
This message and attachments are subject to a disclaimer.
Please refer to
http://upnet.up.ac.za/services/it/documentation/docs/004167.pdf for full
details.
_______________________________________________
subsurface mailing list
[email protected]
http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface