In CCR dive planning, allowing for sufficient gas volume depends on a knowledge of which gas sources are used CC and which gas sources are used for bailout (=OC). For CCR, bailout is indicated by a 1-minute dive segment with setpoint of 0 and subsequent gas use calculations are performed assuming open circuit. In the case of SCR, a setpoint makes no sense and I cannot find a way to signify a switch to OC: gas consumption is calculated assuming the dilution ratio specified in the preferences. Is there a way to get around this?

Kind regards,

willem



--
This message and attachments are subject to a disclaimer.
Please refer to http://upnet.up.ac.za/services/it/documentation/docs/004167.pdf for full details.
_______________________________________________
subsurface mailing list
[email protected]
http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface

Reply via email to