Hi Tormento, I suggest unchecking the 'display transitions in deco' option. It will then only show the actual stops.
Rick P.S. yes I'm still around On Fri, 6 Sep. 2019, 19:21 tormento, <[email protected]> wrote: > I have started to use EAN50 to cut deco and I am planning some diving. > > In available gas I put bot twin bottle air and the EAN50 bottle. > > Let's do, as example, 32 minutes @ 37 meters. GF 45/95. > > Even if I check "Only switch at required stops", the dive plan details > show me the 21m (MOD of EAN50) gate obviously with the ascend time only, as > no deco is planned at that depth. > > depth duration runtime gas > ➘ 37m 2min 2min air > ➙ 37m 30min 32min > *➚ 21m 2min 34min * > ➚ 15m 1min 34min > - 15m 1min 35min EAN50 > ➚ 12m 0min 35min > - 12m 2min 37min > ➚ 9m 0min 37min > - 9m 3min 40min > ➚ 6m 0min 40min > - 6m 15min 55min > ➚ 0m 1min 56min > > It would be nice that no more info than necessary would be shown or > calculated. > > Can you please fix that when ""Only switch at required stops" is set? > _______________________________________________ > subsurface mailing list > [email protected] > http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface >
_______________________________________________ subsurface mailing list [email protected] http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
