Dear Michael,

Many thanks for your kind response and information.

Regards
Radha

On Wed, Nov 6, 2019 at 9:04 PM Michael Behrisch <[email protected]> wrote:

> Hi,
> the time loss in a single time step is calculated as
>  step_length * (1 - v / v_max)
> where v_max takes into account the speedFactor, maxSpeed on the lane and
> the vType. For a time interval it is simply summed up.
>
> Best regards,
> Michael
>
> Am 06.11.19 um 19:34 schrieb Radha Reddy:
> > Dear Manh,
> >
> > Many thanks for your response.
> >
> > But my question is about the documentation or mathematical formulation
> > that have used in estimating the Time Loss.
> >
> > Regards
> > Radha
> >
> > On Wed, Nov 6, 2019 at 5:33 PM Manh Do Van <[email protected]
> > <mailto:[email protected]>> wrote:
> >
> >     FYI,
> >     I think you should use the out-put files from E2 (lane area
> >     detector), firstly you have to install E2 in each lanes in your
> >     traffic simulation model, then you can have many information from
> >     output fine of E2, for example, jam lengths, time loss, mean time
> >     loss,..etc
> >
> >     Regards,
> >
> >     On Mon, Nov 4, 2019 at 3:24 PM Radha Reddy
> >     <[email protected] <mailto:[email protected]>>
> wrote:
> >
> >         Hello,
> >
> >         I am analyzing the time loss parameter of TraCI, however, there
> >         is no much information on how this time loss will be estimated.
> >         Anyone, please provide me some documents where I can find
> >         detailed information about time loss.
> >
> >         Regards
> >         Radha
> >         _______________________________________________
> >         sumo-user mailing list
> >         [email protected] <mailto:[email protected]>
> >         To change your delivery options, retrieve your password, or
> >         unsubscribe from this list, visit
> >         https://www.eclipse.org/mailman/listinfo/sumo-user
> >
> >     --
> >
> >     */Many thanks and Best Regard !
> >     /*
> >
> >     *Manh, Do Van ( Mr )
> >     *
> >
> >     *Civil Engineering Faculty*
> >
> >     *UNIVERSITY OF TRANSPORT AND COMMUNICATIONS***
> >     Add: No.3 Cau Giay St, Lang Thuong Ward, Dong Da Dist, Ha Noi Viet
> Nam
> >
> >     Mobile : +84-972573673
> >
> >     Email: [email protected] <mailto:[email protected]>;
> >     [email protected] <mailto:[email protected]>
> >
> >     Website: http://www.utc.edu.vn <http://www.uct.edu.vn/>
> >
> >     _______________________________________________
> >     sumo-user mailing list
> >     [email protected] <mailto:[email protected]>
> >     To change your delivery options, retrieve your password, or
> >     unsubscribe from this list, visit
> >     https://www.eclipse.org/mailman/listinfo/sumo-user
> >
> >
> > _______________________________________________
> > sumo-user mailing list
> > [email protected]
> > To change your delivery options, retrieve your password, or unsubscribe
> from this list, visit
> > https://www.eclipse.org/mailman/listinfo/sumo-user
> >
>
>
> _______________________________________________
> sumo-user mailing list
> [email protected]
> To change your delivery options, retrieve your password, or unsubscribe
> from this list, visit
> https://www.eclipse.org/mailman/listinfo/sumo-user
>
_______________________________________________
sumo-user mailing list
[email protected]
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://www.eclipse.org/mailman/listinfo/sumo-user

Reply via email to