Hello,

I have two straight edges with 2 lanes. I'm trying to build a zipper merge at 
the node between the two edges.

I've set the node as zipper but it seems like NetEdit is not letting me set up 
the connections as zipper merge.

Is there any way I can set up the connections as shown in the attached 
screenshot?

Thank you.
_______________________________________________
sumo-user mailing list
[email protected]
To unsubscribe from this list, visit 
https://www.eclipse.org/mailman/listinfo/sumo-user

Reply via email to