Hello, I have two straight edges with 2 lanes. I'm trying to build a zipper merge at the node between the two edges.
I've set the node as zipper but it seems like NetEdit is not letting me set up the connections as zipper merge. Is there any way I can set up the connections as shown in the attached screenshot? Thank you.
_______________________________________________ sumo-user mailing list [email protected] To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user
