Please attach the network. Am Mi., 16. Dez. 2020 um 11:28 Uhr schrieb Jose Monreal Bailey < [email protected]>:
> Hey everyone, > > I am trying to associate the lanes state with its corresponding TL phase. > I have a junction (image attached) where the right lane on every edge only > turns to the right, and my TL program is the following, > > <phase duration="3" max="3" minDur="3" > state="rrrrrrrrryrrrrrrrrryrrrr"/> > <phase duration="30" max="30" minDur="10" > state="rrrrrGGGGrrrrrrGGGGrGrGr"/> > <phase duration="3" max="3" minDur="3" > state="rrrrryyyyrrrrrryyyyryryr"/> > <phase duration="15" max="15" minDur="5" > state="rrrrGrrrrrrrrrGrrrrrrrrr"/> > <phase duration="3" max="3" minDur="3" > state="rrrryrrrrrrrrryrrrrrrrrr"/> > <phase duration="18" max="18" minDur="6" > state="GGGGrrrrrrGGGGrrrrrrrGrG"/> > <phase duration="3" max="3" minDur="3" > state="yyyyrrrrrryyyyrrrrrrryry"/> > > However, I believe my program is either wrong, or is there an error in > getControlledLinks. As the length of the state of a phase is 24, but > getControlledLinks only brings 20. > Am I missing something? > > Best regards, > Jose > _______________________________________________ > sumo-user mailing list > [email protected] > To unsubscribe from this list, visit > https://www.eclipse.org/mailman/listinfo/sumo-user >
_______________________________________________ sumo-user mailing list [email protected] To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user
