Please attach the network.

Am Mi., 16. Dez. 2020 um 11:28 Uhr schrieb Jose Monreal Bailey <
[email protected]>:

> Hey everyone,
>
> I am trying to associate the lanes state with its corresponding TL phase.
> I have a junction (image attached) where the right lane on every edge only
> turns to the right, and my TL program is the following,
>
>         <phase duration="3" max="3" minDur="3"
> state="rrrrrrrrryrrrrrrrrryrrrr"/>
>         <phase duration="30" max="30" minDur="10"
> state="rrrrrGGGGrrrrrrGGGGrGrGr"/>
>         <phase duration="3" max="3" minDur="3"
> state="rrrrryyyyrrrrrryyyyryryr"/>
>         <phase duration="15" max="15" minDur="5"
> state="rrrrGrrrrrrrrrGrrrrrrrrr"/>
>         <phase duration="3" max="3" minDur="3"
> state="rrrryrrrrrrrrryrrrrrrrrr"/>
>         <phase duration="18" max="18" minDur="6"
> state="GGGGrrrrrrGGGGrrrrrrrGrG"/>
>         <phase duration="3" max="3" minDur="3"
> state="yyyyrrrrrryyyyrrrrrrryry"/>
>
> However, I believe my program is either wrong, or is there an error in
> getControlledLinks. As the length of the state of a phase is 24, but
> getControlledLinks only brings 20.
> Am I missing something?
>
> Best regards,
> Jose
> _______________________________________________
> sumo-user mailing list
> [email protected]
> To unsubscribe from this list, visit
> https://www.eclipse.org/mailman/listinfo/sumo-user
>
_______________________________________________
sumo-user mailing list
[email protected]
To unsubscribe from this list, visit 
https://www.eclipse.org/mailman/listinfo/sumo-user

Reply via email to