Hello,
 As described in the paper, the LuST dataset is of 24hrs. I find the
sumo.cfg file starts from 0 with step size 1 (without any end field).
I want to confirm the starting time of the cfg? Is it 12 AM?

For example, if I want to generate traffic only from 8AM to 8:02AM, should
I use---
start time = (3600x8) = 28,800
end time = 28,800 + 120 (60 x 2 min) = 28920? and step size = 1
Is my understanding correct?

And if I want the step size as 0.1 (i.e. snaps at every 0.1s), how should I
modify the cfg? Only the step-size or both start and end time needs to be
adjusted accordingly?

Thanks.
_______________________________________________
sumo-user mailing list
[email protected]
To unsubscribe from this list, visit 
https://www.eclipse.org/mailman/listinfo/sumo-user

Reply via email to