Hi Shreyas,
it is not sufficient to look whether the start and the end node match to
see that there actually is a connection (think of forbidden left turns).
You need to have a look at the connections defined at the end of the net
file. If there is one connecting the two edges you mentioned, there may
still be a problem with the permitted vehicle classes (although from the
short excerpt you sent, I don't think you are making use of those).

Regards,
Michael

Am 06.04.2015 um 03:14 schrieb SHREYAS JAYANNA (RIT Student):
> Hello,
> 
> In my simulation, I'm required to generate routes dynamically and reroute
> vehicles as required along the new routes. When I reroute a vehicle, for
> few of the routes, Sumo throws this error:
> 
> Error: Vehicle '1423' has no valid route. No connection between '183794602'
> and '-221788478#9'.
> 
> 
> I checked the .Net file and the connection actually exists. Below are the
> entries from the .net file.
> 
> <edge id="183794602" from="1942054125" to="42468603" priority="9"
> type="highway.primary" spreadType="center" shape="10174.55,8344.40
> 10163.57,8343.15 10145.86,8339.61 10120.59,8331.53">
> 
> <edge id="-221788478#9" from="42468603" to="1942054145" priority="7"
> type="highway.secondary">
>         <lane id="-221788478#9_0" index="0" speed="27.78" length="2.34"
> shape="10115.26,8345.74 10113.77,8347.54"/>
>         <lane id="-221788478#9_1" index="1" speed="27.78" length="2.34"
> shape="10112.72,8343.64 10111.23,8345.44"/>
>     </edge>
> 
> I'm not able to understand what exactly the problem is. Any help will be
> greatly appreciated. I'm literally in a race against time to complete this
> project and hence quick responses will help me a lot!
> 
> Thanks in advance.
> 
> Regards,
> Shreyas
> ------------------------------------------------------------------------------
> BPM Camp - Free Virtual Workshop May 6th at 10am PDT/1PM EDT
> Develop your own process in accordance with the BPMN 2 standard
> Learn Process modeling best practices with Bonita BPM through live exercises
> http://www.bonitasoft.com/be-part-of-it/events/bpm-camp-virtual- event?utm_
> source=Sourceforge_BPM_Camp_5_6_15&utm_medium=email&utm_campaign=VA_SF
> _______________________________________________
> sumo-user mailing list
> [email protected]
> https://lists.sourceforge.net/lists/listinfo/sumo-user
> 


------------------------------------------------------------------------------
BPM Camp - Free Virtual Workshop May 6th at 10am PDT/1PM EDT
Develop your own process in accordance with the BPMN 2 standard
Learn Process modeling best practices with Bonita BPM through live exercises
http://www.bonitasoft.com/be-part-of-it/events/bpm-camp-virtual- event?utm_
source=Sourceforge_BPM_Camp_5_6_15&utm_medium=email&utm_campaign=VA_SF
_______________________________________________
sumo-user mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/sumo-user

Reply via email to