If you build without enable-calendar Lightning will not work. It needs some
binary components which are now linked into SeaMonkey and Thunderbird itself
with enable-calendar. Previously we had a workaround (or better big hack) in
which enabled only them regardless of the build flag. But with the ability to
use enable-calendar again for l10n builds we dropped this for 2.49.5
FRG
lj wrote:
I'm using Seamonkey on Slackware Linux (32bit). Even though the official
Seamonkey builds now include the Lightning extension, Slackware builds
their Seamonkey without Lightning. I've always just added Lightning from the
Add-ons site (currently addons.thunderbird.net).
Slackware just released an update to Seamonkey-2.49.5, and it no longer
works with Lightning-4.5. Trying to open the calendar results in an
extremely wide Mail/News window, blank window, disabled UI elements, and
this message in the terminal:
addons.manager WARN Exception calling callback:
ReferenceError: openAddonsMgr is not defined
(chrome://lightning/content/messenger-overlay-sidebar.js:943:9)
...
The official Seamonkey build works with both its bundled Lightning, and
with the Lightning-4.5 add-on separately downloaded and added (after
removing the bundled one).
Is it possible something changed between Seamonkey-2.49.4 and 2.49.5 that
prevents adding Lightning unless Seamonkey was built with --enable-calendar?
_______________________________________________
support-seamonkey mailing list
[email protected]
https://lists.mozilla.org/listinfo/support-seamonkey