Hello, I'm looking to upgrade my ucapred setup (2 machines in failover mode) to 1.2.3.
What's the best way of doing this? Should I do the live one first, let it switch over then do the other on and let it switch back Or should I do the standby first then switch over the live? I'm doing the upgrade mostly for the haproxy package, the plan is to use the pfsense boxes as a load balancer, passing requests to our apache servers on the inside. Any thoughts on this? Thanks, Josh. --------------------------------------------------------------------- To unsubscribe, e-mail: [email protected] For additional commands, e-mail: [email protected] Commercial support available - https://portal.pfsense.org
