Author: Derick Rethans
Date: 2007-04-03 15:29:42 +0200 (Tue, 03 Apr 2007)
New Revision: 4804

Log:
- Fixed typoes.

Modified:
   docs/dev_process.txt

Modified: docs/dev_process.txt
===================================================================
--- docs/dev_process.txt        2007-04-03 12:54:33 UTC (rev 4803)
+++ docs/dev_process.txt        2007-04-03 13:29:42 UTC (rev 4804)
@@ -11,9 +11,9 @@
 that need to be followed. This document summarizes the steps and provides
 pointers to the relevant guidelines where that is relevant.
 
-Our development process consists of a set of eight steps; transitions between
+Our development process consists of a set of seven steps; transitions between
 the different states can be done when the criteria are matched that describe
-the finalization of each step.  Depending on the situation not all eight steps
+the finalization of each step.  Depending on the situation not all seven steps
 are necessary (for example for bug fixes you don't need to write a Requirements
 Document or Design Specification as a bug is simply a feature that doesn't
 adhere to those documents).
@@ -343,9 +343,9 @@
 .. _`tutorial`: http://svn.ez.no/svn/ezcomponents/docs/guidelines/tutorial.txt
 .. _`issue tracker`: http://issues.ez.no
 
-..
-   Local Variables:
-   mode: rst
-   fill-column: 79
-   End:
-   vim: et syn=rst tw=79
+
+.. Local Variables:
+.. mode: rst
+.. fill-column: 79
+.. End:
+.. vim: et syn=rst tw=79

-- 
svn-components mailing list
svn-components@lists.ez.no
http://lists.ez.no/mailman/listinfo/svn-components

Reply via email to