https://bugs.meego.com/show_bug.cgi?id=22669

           Summary: CalDAV: add<->add conflicts
    Classification: MeeGo Projects
           Product: SyncEvolution
          Platform: ---
           Version: unspecified
          Platform: Common
      Architecture: ---
            Status: NEW
          Severity: normal
          Priority: Undecided
         Component: SyncEvolution
        AssignedTo: [email protected]
        ReportedBy: [email protected]
         QAContact: [email protected]
                CC: [email protected],
                    [email protected]
   Estimated Hours: 0.0


Suppose the same meeting invitation for event UID=FOO is processed in
both Evolution and Google Calendar. This always happens when the meeting
invitation emails is sent to Google Mail, then later viewed in Evolution.
On the Evolution side, the invitation is accepted. In Google Calendar this is
still open.

When syncing in that state the sync engine does not recognize that both sides
have added the same meeting and the "meeting accepted" information eventually
gets lost.

As a workaround, always synchronize the calendar before processing meeting
invitation emails.

See "[SyncEvolution] UID matching during add<->add conflict" for a discussion
how this can be solved in the engine.

--------
Product: SyncEvolution
Component: SyncEvolution
MeeGo Release: unspecified
Severity: normal
Priority: Undecided
Keywords: 
Status: NEW
Who: [email protected]
Assigned To: [email protected]
Target Build: ---
Flags: 
Changed: 
--------

https://bugs.meego.com/show_bug.cgi?id=22669


-- 
Configure bugmail: https://bugs.meego.com/userprefs.cgi?tab=email
------- You are receiving this mail because: -------
You are watching the assignee of the bug.
You are watching someone on the CC list of the bug.
_______________________________________________
Syncevolution-issues mailing list
[email protected]
http://lists.syncevolution.org/listinfo/syncevolution-issues

Reply via email to