https://bugs.freedesktop.org/show_bug.cgi?id=63471

Patrick Ohly <[email protected]> changed:

           What    |Removed                     |Added
----------------------------------------------------------------------------
             Status|ASSIGNED                    |RESOLVED
         Resolution|---                         |FIXED

--- Comment #1 from Patrick Ohly <[email protected]> ---
In master, see

commit b6b75de59ba284b0497e450d2bbe76523d1ee523
Author: Patrick Ohly <[email protected]>
Date:   Tue May 7 16:39:50 2013 +0200

    PIM: new return value for SyncPeer(), new SyncProgress signal (FDO #63417)

    The SyncPeer() result is derived from the sync statistics. To have
    them available, the "sync done" signal must include the SyncReport.

    Start and end of a sync could already be detected; "modified" signals
    while a sync runs depends on a new signal inside the SyncContext when
    switching from one cycle to the next and at the end of the last one.

-- 
You are receiving this mail because:
You are on the CC list for the bug.
_______________________________________________
Syncevolution-issues mailing list
[email protected]
https://lists.syncevolution.org/mailman/listinfo/syncevolution-issues

Reply via email to