Hi,
> Sep 1 mib draftspublished with requested changes (before WGLC)
Sep 4 is a more realistic date.
Glenn
David Harrington wrote:
Hi,
In the original timeline, we planned to start the WGLC for syslog-tls
on Aug 28, but we didn't have an updated document to work with. Now a
revision has been published, so we'll start the WGLC now.
Here is another update to the timeline
Aug 28 Close WGLC on protocol and udp
Aug 28 start WGLC on syslog-sign
Aug 29 tls drafts published with requested changes (before WGLC)
Aug 29 start WGLC on syslog-tls
Sep 1 mib draftspublished with requested changes (before WGLC)
Sep 4 start WGLC on mib draft
Sep 11 Close WGLC on syslog-sign
Sep 11 revisions of protocol and udp drafts (after WGLC)
Sep 12 Close WGLC on syslog-tls document
Sep 18 Close WGLC for mib
Sep 25 revisions of sign, tls, mib
Sep 25 start final WGLC on all modified documents if needed.
Oct 9 end final WGLCs
Oct 20 submit all final-WGLC-modified drafts to internet-drafts
Oct 23 publication cut-off preceding IETF67
Nov 1 submit documents to the IESG.
David Harrington
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
_______________________________________________
Syslog mailing list
[email protected]
https://www1.ietf.org/mailman/listinfo/syslog
_______________________________________________
Syslog mailing list
[email protected]
https://www1.ietf.org/mailman/listinfo/syslog
_______________________________________________
Syslog mailing list
[email protected]
https://www1.ietf.org/mailman/listinfo/syslog