In English, overground power transmission is done by overground power *lines
*(strands of metal without insulation, using the air as insulator),
underground power transmission is done by means of underground power *cables
* (strands of metal with insulation)
(see: https://en.wikipedia.org/wiki/Electric_power_transmission,
#Underground transmission)

For that reason I would consider power=line + location=underground at least
confusing, if not contradictory. power=cable + location=underground is
definitely to be preferred.

Volker


On 15 January 2013 14:50, François Lacombe <
[email protected]> wrote:

> undergound power lines





-- 
Volker SCHMIDT
Via del Cristo 28
35127 Padova
Italy

mailto:[email protected]
personal mobile: +39-340-1427105
skype: volker.schmidt
_______________________________________________
Tagging mailing list
[email protected]
http://lists.openstreetmap.org/listinfo/tagging

Reply via email to