Hi, I'm putting tails-ux in copy but the implications of these mostly affect development work so please answer on tails-dev.
Last week-end we did intensive testing of the current prototype for the Installation Assistant. We spent 18 hours testing the whole process with 16 people and many findings came out of it. You can check the rainbow table [1] if you want to see our findings. Today I'll also write a more specific email about the work left to be done on the extension. [1]: https://labs.riseup.net/code/attachments/download/1070/ux-testing-20151120.ods Then we decided on the release schedule for the whole thing. And I want to check with Girgio and u whether that's fine with them. We thought about doing: - A beta release in time for 1.8 (December 15). The assistant would be advertised in the release notes, maybe tweet about it and send a mail to tails-testers. That's tracked by #8590 and subtasks. - A final release in time for or before (January 26). The assistant would then replace the current installation instructions and be linked from the current "Download" button on the website (renamed "Install"). That's tracked by #8592 and subtasks. So by December 15 we would need to have: - The Debian and Ubuntu packages ready in backports and PPA. So we can do the beta with the final instructions for them. - A version of the extension uploaded to addons.mozilla.org so we can point to it instead of maone.net. Does that seems feasible to you? _______________________________________________ Tails-dev mailing list [email protected] https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to [email protected].
