Hi,

Long-time lurker, first time poster. I mainly add/edit features relevant to 
off-roard bike and hiking, but mainly small ones to date and there’s a big 
change I’d prefer to run by the group first.

West of Newcastle is the abandoned Richmond Vale Railway, only partially 
covered by this route: https://www.openstreetmap.org/way/173086136 . It looks 
like the only edits in the last few years have been by myself (neomanic) since 
it was updated from railway=disused to abandoned.

It is used quite a bit for trail running and mountain biking currently (I have 
done it a number of times), and is proposed for a rail trail: 
https://www.newcastle.nsw.gov.au/council/news/projects-and-works/shortland-richmond-vale-rail-trail

My proposal is to alter the ways associated with the track to highway=track 
(it’s all wide enough for vehicles), but retain railway=abandoned, and add all 
the missing ways to the above relation. 

My main reasoning behind this is to raise it’s visibility as a walk and ride 
option, and allow routing along it, as current routers (Strava, Komoot) ignore 
it altogether (much to my annoyance). It’s what’s been done for locally, the 
Fernleigh Track (https://www.openstreetmap.org/relation/2269030), and elsewhere 
eg The Great Victorian Rail Trail 
(https://www.openstreetmap.org/relation/1043265)

Now the other question is what should be done with the proposal as far as 
adding tags. This way is on the old rail line and part of the proposal, 
https://www.openstreetmap.org/way/243988974 has railway=abandoned, 
highway=proposed and proposed=cycleway. It’s all accessible now, so it should 
be highway=track (surface=unpaved), but then how to tag for the proposal?

Thanks,
Josh
_______________________________________________
Talk-au mailing list
[email protected]
https://lists.openstreetmap.org/listinfo/talk-au

Reply via email to