The Upper Charles Trail was included in the MASSgis import. It has a note="under construction". As imported and proposed, it slavishly followed a passenger and freight line straight to the center of town, but Milford sensibly added scenic curves and grades, connecting a picnic area and municipal ball fields, and using an interchange underpass instead of digging anew where I-495 had obliterated the rail. As fair as I can tell from web, it may not be completed much beyond where I explored on foot in Milford.
What are the tags for abandoned RR right of way that is NOT a biketrail, but still visible? Is there any value to keeping the MASSGIS tags for the old right of way and proposed route where it has been blocked by re-grading, housing development, and or foliage? How much of the MASSGIS tags should be copied to the as-built path, if any? -- Bill [email protected] [email protected] _______________________________________________ Talk-us mailing list [email protected] http://lists.openstreetmap.org/listinfo/talk-us

