2010/1/1 Steve Bennett <[email protected]>:
> On Sat, Jan 2, 2010 at 12:14 AM, Dave F. <[email protected]> wrote:
>>
>> I don't why he feels the need to do this, it seems a pointless task, but
>> why do you think it reduces accuracy to remove trailing zeros?
>>
>> 2m =2.0m
>>
>
> It reduces *indication of accuracy*.
>
> There's a difference between "I measured that bridge, and it's 2 metres
> high" and "I measured that bridge, and it's 2.000 metres high". If the
> signposted maximum height under the bridge is 2.0m, it should be recorded as
> 2.0, not as 2. Especially since for such things, 10 centimetres here or
> there is pretty significant.

Not to mention most signs on bridges indicate 2.0m not 2m.

_______________________________________________
talk mailing list
[email protected]
http://lists.openstreetmap.org/listinfo/talk

Reply via email to